Black River Electric Cooperative

In 1999 Black River Electric contacted Sargent Construction Co. to look at the possibility of building a new complex on Hwy 67 North of Fredericktown. As we developed the site plans, building floor plans, and then a budget estimate, the Board of Directors from BREC signed the contract to build the new complex. Dan Tilk was put in charge of the design and construction manager on the project. The project was completed in early 2000Continue reading