Addition to existing manufacturing building for new single serve container lines. Building has 4 concrete stem wall around perimeter and openings will be cut in existing wall to travel between buildings.
Crown Air Park Warehouse B
Reed’s Metal Building Large warehouse with multiple dock doors.
Cap America Addition
Large warehouse designed for rack storage. LED lighting with occupancy sensor, air conditioned using duct sock for duct work. Connected to existing facility with 10 x 15 connector building.
Busenbark Granite
Sargent assisted owner with concrete and building design. The building supports 5crane systems.
Proffer Produce Warehouse Addition
Addition to Building – Two Sides Difficult Transitions – two (2) dock doors.
Missouri Cobalt
Cobalt Production Building. Building erection was done over owner’s equipment and mezzanines.
Earthworks Inc. Addition
50 X 50 Metal building addition for new stone cutting equipment.
Confidential Client
Industrial manufacturing project which involved full design-build services. Work included structural steel, metal building systems, concrete foundations, electrical and mechanical.
CertainTeed Bag Filler Addition
Building was located on a steep hill side requiring the use of a 80′ snorkel lift. Special work hours and coordination required with CertainTeed so trucks were not blocked and loading was not interrupted.